Bellevue Place – Jakarta

The ground anchor is used to stabilized the bor pile retaining wall during basement construction Owner : PT Graha Azzura Main Contractor : PT Pembangunan Perumahan Project Location : Jakarta Type : Temporary Ground Anchor Length : 19.25 m & 22.3m Quantity : 106 nos

Normalisasi Kali Ciliwung – Kampung Melayu

The ground anchor is used to stabilize the sheet pile Owner : BBWS Cilicis – Departemen Pekerjaan Umum & Perumahan Rakyat Main Contractor : ADHI KARYA – JAKON KSO Project Location : Jakarta Type : Permanent Ground Anchor Length : 25 m Quantity : 100 nos

Skycity Theater and Convention Center – JIEXPO

The ground anchor is used to stabilise the bore pile retaining wall during basement construction Owner : Jakarta International Expo Main Contractor : Beatty Balfour Sakti – Total Bangun Persada JO Project Location : Jakarta Type : Temporary Ground Anchor Length : 40.5 m Quantity : 121 nos

Synthetic Rubber Indonesia SRI U3

The vertical ground anchor is used to resist vertical forces of tank due to excess hydraulic pressures Owner : SYNTHETIC RUBBER INDONESIA EPC Contractor : TOYO – IKPT Joint Operation Civil Contractor : PT SWADAYA GRAHA Project Location : Cilegon Type : Permanent Ground Anchor Length : 15 m Quantity : 370 nos

Freyssinet International Safety Week 2016

From the 26th to the 30th of September, the entire Soletanche Freyssinet group mobilised on health and safety questions during the third edition of VINCI Construction’s International Safety Week. All VINCI Construction’s subsidiaries including Freyssinet Indonesia celebrated this event. This year event theme was “Watching Out All Together” and focused mainly on three topics: Working

Read More

Dr. Ir. Soekarno Bridge

Description Dr. Ir. Soekarno Bridge is a new 1.127 km bridge in the shore of Manado Bay, this bridge connects Boulevard I to Boulevard II as part of Manado Outer Ring Road located in North Sulawesi, Indonesia. The construction started in October 2003 and the bridge has been opened since May 2015, the pre-stressed concrete

Read More

SUDETAN KALI CILIWUNG

Front view of permanent ground anchors  at sheet-pile in East Flood Channel of Jakarta (BKT).            Description East Flood Channel (BKT)) construction was began on 2002 with the width of channel varies from 100 to 300 meter. The channel will accommodate the flow of river of Ciliwung, Cililitan, Cipinang, Sunter, Buaran,  Jati Kramat, and Cakung.

Read More

Holcim Cement Silo

Description Holcim Cement Silo is located within Holcim Cement Terminal in Lampung, Sumatra, 50 meter height with diameter of 20 meter, stretching across 4.7 hectare of land and with capacity of 1 million ton per year. The Holcim Cement Terminal features a high technological process, easy operation, electricity saving, and is environmental friendly. Scope of

Read More

Supply Pot Bearing: Jangkrik Complex Project – FPU

Description Jangkrik Field (also abbreviated as JKK) is a gas discovery made in March 2009. To date, three exploration wells (Jangkrik-1, Jangkrik-2 and Jangkrik-3) have been drilled. The selected concept is based on a subsea development with seven wells, full treatment facilities on a spread moored FPU and export line to shore at Sapi landfall.

Read More