Description
Jembatan 4 is located Main Road Row 28. Kota Baru Parahyangan. This is the forth bridge of Kota Baru Parahyangan as developer with 215 length meter and as Box Girder. The usage of pot bearing is to accommodation vertical load, horizontal load, displacement and also rotation of Bridge. The load from Consultant is calculated for 1000 years Earthquake. To consider the dimension of pot bearing and expansion joint, all type of bearing is using Guided (one direstion) GG 4500_2000_240.
Scope of Works
The work done by Freyssinet was to supervise the installation of pot bearing & expansion joint. There were:
- 8 pot bearing GG 4500_2000_240 –
- 43 meter of MULTIFLEX SX270 of expansion joint will be installed
Owner Belaputera Intiland
Main Contractor Adhi Karya (Persero) Tbk. Divisi Konstruksi 1
Consultant PT Delta Global Struktur Consulting
Years of involvement April 2016 – Now (Estimation End of 2016)
Project Manager Anggi Raditya