The construction of new building at Universitas Multimedia Nusantara has reached the third phase. This phase is extension from the old building which requires a connection to unite the old and new structures. To connect this structures, expansion joint is required to prevent the failure of the building in event of earthquake
Scope of Works
Freyssinet did the work of installation expansion joint type AFE FP-150 with 82 m long.
Owner PT. Media Nusantara
Main Contractor PT. Total Bangun Persada
Consultant PT Davy Sukamta Konsultan
Years of involvement May 2017